Initial Phases
OBJECTIVE: Getting accustomed to the CLI of network devices and ensuring end-to-end connectivity

Wiring the devices, changing the router's name, setting an enable password, configuring a banner, and changing the IPs on the two interfaces.

The same steps on the switch.

Configuring IP addresses on end-devices.

Connecting via Telnet.

Connecting via SSH.

Ping between end devices in the same network, in different networks, and between end devices and routers.

Final view.
